Questions asked before a purchase
Before asking for a quote on a B2B network project, buyers usually want a few things settled: who the supplier is, how the project starts, how the money works, whether installation stops trading, how fast someone turns up, and whether the qualifications will pass a tender. The answers are grouped below.
Working with us
Do you supply the equipment as well as the delivery service?
We supply network equipment and the delivery service around it. Hardware is specified per project; service can be bought on its own or bundled with hardware, quoted and accepted separately. Models and specifications are on the product pages.
How does a project start?
With an inventory: we count the devices, circuits, vendor contracts and open issues, and put the judgement in writing — what still has life, where the risks are, where the operational load sits. Scope and duration follow the project. That document is what a quote can stand on, and what shows which equipment need not be replaced.
Why are there no prices on the site?
In network work the price is set by site conditions, not by a product catalog. For the same hundred sites — lift shafts or not, night work possible or not, old equipment usable or not — the quote can differ several times over. Fixed pricing only works for standardized goods.
Can we buy delivery only, without operations?
Yes. Managed operations, implementation and delivery, spares and support, and advisory are priced and accepted separately and can be combined as needed. Delivery without operations is a common mix.
Is there a minimum project size?
No fixed threshold, but scale changes the method: a single office network and a multi-region estate are two different ways of delivering. Describe the site and we will tell you plainly whether we are the right fit.
Delivery and installation
Will installation interrupt trading or production?
Multi-site work runs at night, with trading as usual by day. Where operation is 24/7 with no window at all, a cutover design has to come first — and we say so before quoting.
How large a replacement can you take on?
Our largest delivered case cut over 800 sites in a month using standardized configuration and zero-touch provisioning (ZTP), which keeps on-site work to a minimum. Beyond that, the constraint is usually people on the ground and available windows, not the technology.
What documents come with delivery?
The exact list is agreed in the contract. Typically: a device and circuit register, configuration baselines, topology, acceptance records and a handover note for operations. Projects under MLPS or industry audit add logs, policy and remediation records as compliance requires.
Can the old equipment stay?
Whatever still has life is stated plainly. One section of the inventory output is exactly that — which existing equipment can stay. The report does not recommend wholesale replacement to swell the contract.
Service and response
How fast do you respond to a fault?
Four tiers, set by business impact: P1 in thirty minutes, P2 in eight hours, P3 in twenty-four, P4 in forty-eight. The definitions sit in a contract annex, so no incident starts with an argument about whether it counts as a P1. The contract governs the actual figures.
Is it 7×24 cover?
Managed operations is covered 7×24, in Chinese, English and Cantonese. Scope and roster are set in the contract.
How is the service measured?
A monthly SLA scorecard and a quarterly service review. The scoring rules are fixed in the contract, and the results feed straight into the next period's adjustments rather than a single year-end summary.
Who is accountable when something breaks?
Within the contract we own it end to end, whether the fault lies in equipment, circuit or configuration. That is the core difference from splitting maintenance between several parties: nobody has to settle responsibility before diagnosis begins.
Qualifications and compliance
What qualifications do you hold?
Five ISO management system certifications (9001 / 14001 / 45001 / 27001 / 20000), one granted invention patent and registered software copyrights. Certificate numbers and validity dates are on the certifications page and can be checked against the regulator's register.
What can you provide for a tender?
Scanned certificates and help verifying numbers, on request. The usual prequalification pack — business licence, system certificates, project record and staff credentials — can be supplied in one go.
Where does operational data live?
In the customer's own environment. The platform does not depend on one vendor's product lifecycle, so changing equipment does not mean changing the monitoring system; site-specific process — approvals, change windows, reporting rules — is configured rather than imposed.
See office addresses and contact details →