Four service lines, priced separately — not bundled into one number
This page explains what a quote is made of, what changes the price, and how to get a quotation you can actually read. We do not publish prices, because in network work the price is set by site conditions, not by a product catalog.
Four lines, priced separately
The commonest quoting problem in network work is bundling: everything rolled into a single figure, so the customer cannot see where the money goes or cut what they do not need. We quote the four lines separately.
| Service line | Priced on | Notes |
|---|---|---|
| Managed NOC | By device count and severity tier | 7×24 cover, alert correlation, change trail, monthly scoring |
| Implementation & delivery | By site count, device volume and working windows | Survey, design, installation, cutover, acceptance |
| Spare parts & maintenance | By model and spares ratio | 3–5% spares at the access layer, with district rotation stock on multi-site work |
| Advisory & architecture | By scope and deliverables | Inventory, three-year roadmap, budget and option comparison |
Four lines, priced and accepted separately. Implementation without operations, or advisory without hardware, are both normal combinations.
Four things that move the price
1. Site conditions
The same hundred sites: lift shafts or not, night work possible or not, a room of their own or not, cable to be re-pulled or not — all of it changes the amount of work. This can only be seen on site, not estimated from a catalog.
2. How much of the existing estate can stay
Replacing everything and reusing part of it are very different numbers. The inventory states which equipment can stay — and what that saves is usually more than any discount negotiated.
3. Working windows
A project that can close for the day and one that must work nights to keep trading carry different labour costs. Where operation is 24/7 with no window at all, the cutover has to be designed separately.
4. Service level
A thirty-minute P1 and an eight-hour P1 differ in rostering and in spares held forward. Severity is not set by the size of the customer but by business impact, so different systems at one customer can carry different tiers.
How to get a quote
First, describe the site. How many locations and where, the brands and rough age of what is installed, how much downtime the business can take, and whether there is a fixed inspection or audit date. A topology screenshot or equipment list helps.
Second, an inventory. We give a written judgement: what can stay, where the risks are, where the operational load sits. Scope and duration follow the project.
Third, a quote against the list. Proposal, bill of materials and price come from the same source, with the four lines listed separately. Every figure on the quotation maps to a deliverable.
Three things we do not do
- No selling hardware first and finding a reason after. The assessment starts from your requirements, and the report says which existing equipment need not be replaced.
- No later costs buried in the proposal. Proposal and price come from the same source; new work in the build phase is confirmed separately.
- No low bid followed by variations. The quote reflects the site conditions we can confirm; when they change, the variation has a written basis.
See office addresses and contact details →