Opened the wrong way — this page has no styling and no images.
Image and stylesheet paths are resolved from the site root (/assets/…), so opening the file directly resolves them to C:\assets\… and nothing loads.
To see it properly: unzip 2_双击进后台改字_仅Windows.zip and double-click 启动后台.bat — the browser then shows the full site with styling, images and the ZH/EN switch.
(This zip is a plain static preview: opened directly it shows one page at a time, without styles, images or the language switch.)
Once uploaded it works normally: live traffic arrives over http, not by double-clicking a file.
This notice only appears when the file is opened locally; online visitors never see it.
ProductsWireless access & coverageSwitching & data centerOptical access & transportOptics & cabling
ServicesManaged NOCImplementation & deliverySpare parts & maintenanceAdvisory & architecture
SolutionsManaged network operations & NOCCampus & wireless coverageCloud-network branchesSecurity & compliance
Case studiesScale · managed operationsSpeed · bulk migrationContinuity · legacy retrofitTechnical notes
About usCompany profileCertificationsOffices & contactTechnical notes
Resources & contactTechnical notesFAQDelivery processPricingPrivacy & termsContact usOffice address
PRICING

Four service lines, priced separately — not bundled into one number

This page explains what a quote is made of, what changes the price, and how to get a quotation you can actually read. We do not publish prices, because in network work the price is set by site conditions, not by a product catalog.

Four lines, priced separately

Not one bundled number

The commonest quoting problem in network work is bundling: everything rolled into a single figure, so the customer cannot see where the money goes or cut what they do not need. We quote the four lines separately.

Service linePriced onNotes
Managed NOCBy device count and severity tier7×24 cover, alert correlation, change trail, monthly scoring
Implementation & deliveryBy site count, device volume and working windowsSurvey, design, installation, cutover, acceptance
Spare parts & maintenanceBy model and spares ratio3–5% spares at the access layer, with district rotation stock on multi-site work
Advisory & architectureBy scope and deliverablesInventory, three-year roadmap, budget and option comparison

Four lines, priced and accepted separately. Implementation without operations, or advisory without hardware, are both normal combinations.

Four things that move the price

Why the same brief can quote several times apart

1. Site conditions

The same hundred sites: lift shafts or not, night work possible or not, a room of their own or not, cable to be re-pulled or not — all of it changes the amount of work. This can only be seen on site, not estimated from a catalog.

2. How much of the existing estate can stay

Replacing everything and reusing part of it are very different numbers. The inventory states which equipment can stay — and what that saves is usually more than any discount negotiated.

3. Working windows

A project that can close for the day and one that must work nights to keep trading carry different labour costs. Where operation is 24/7 with no window at all, the cutover has to be designed separately.

4. Service level

A thirty-minute P1 and an eight-hour P1 differ in rostering and in spares held forward. Severity is not set by the size of the customer but by business impact, so different systems at one customer can carry different tiers.

How to get a quote

Three steps

First, describe the site. How many locations and where, the brands and rough age of what is installed, how much downtime the business can take, and whether there is a fixed inspection or audit date. A topology screenshot or equipment list helps.

Second, an inventory. We give a written judgement: what can stay, where the risks are, where the operational load sits. Scope and duration follow the project.

Third, a quote against the list. Proposal, bill of materials and price come from the same source, with the four lines listed separately. Every figure on the quotation maps to a deliverable.

Three things we do not do

The limits we set when quoting
  • No selling hardware first and finding a reason after. The assessment starts from your requirements, and the report says which existing equipment need not be replaced.
  • No later costs buried in the proposal. Proposal and price come from the same source; new work in the build phase is confirmed separately.
  • No low bid followed by variations. The quote reflects the site conditions we can confirm; when they change, the variation has a written basis.
Not found what you need? Call or email, and we will answer against your site.
See office addresses and contact details →

Describe the site, and the quote has something to stand on.

Contact us →